BIM WORKFLOW
The BIM workflow aims to improve collaboration, reduce errors and conflicts, and enhance project coordination throughout the project lifecycle.
Work Flow
01
Project Planning
​
-
Define the project scope, goals, and objectives.
-
Identify the project stakeholders and their roles.
-
Establish the project timeline and milestones.
03
Detailed Design:
-
Further develop the BIM models with more detail and accuracy.
-
Perform clash detection to identify and resolve any design conflicts among different disciplines.
-
Generate construction documentation from the BIM models, including plans, sections, and schedules.
05
Facility Management:
-
Hand over the BIM models and associated data to the facility management team after construction completion.
-
Use the BIM models to manage and maintain the facility, including asset tracking, maintenance scheduling, and energy analysis.
-
Incorporate data from IoT sensors for real-time monitoring and optimization.
02
Conceptual Design:
-
Develop a high-level BIM model to represent the proposed design.
-
Collaborate with architects, engineers, and other stakeholders to refine the design concept.
-
Use BIM software tools to generate 3D models, including architectural, structural, and MEP (mechanical, electrical, plumbing) systems.
04
Construction and Coordination:
-
Utilize the BIM models for quantity takeoff, material estimation, and cost analysis.
-
Coordinate and collaborate with subcontractors, suppliers, and construction teams using the BIM models as a common data environment.
-
Monitor construction progress against the BIM models and update them as-built.
06
Integration with Other Technologies:
-
Implement interoperability between BIM software and other technologies such as augmented reality (AR) or virtual reality (VR) for enhanced visualization and client engagement.
-
Incorporate data from Building Management Systems (BMS) to further enhance building operations and energy efficiency.